Resource Management in Construction Project

Article Preview

Abstract:

Construction projects experience various problems and complex factors such as cost, duration, quality and safety. Construction sector is diverse as it contains sub-contractors, contractors, consultants, architects, owners, and others. The aim of this paper is to identify and analyze resource management issues in construction project. Other than that is to ascertain the significance of the resource management as one of the key element in construction project success. A literature review and a questionnaire survey were done for data collection and analyzed using Relative Importance Index and Cronbach’s alpha. The questionnaires were distributed to the team members of KLIA 2 – New Low Cost Terminal Project: Client, Architects, Main Contractor, and Sub-Contractor. The findings revealed that dependent on foreign workers to respond to the high demand of skilled workers, weather condition affecting machineries/equipment-work-related performance and weaknesses in quality assurance for the supply of construction materials should be given serious attention in order to ensure the productivity and financial performance of the projects. Keywords: Construction Project Management, Resource Management, Manpower, Machineries, Materials

You might also be interested in these eBooks

Info:

Periodical:

Pages:

607-612

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] I. Othman, A. Idrus & M. Napiah, Human Resource Management in The Construction of a Sustainable Project: Towards Successful Completion, WIT Transactions on Ecology and The Environment, Vol. 162, © 2012 WIT Press.

DOI: 10.2495/eid120161

Google Scholar

[2] Shehata, M. and El-Gohary, K. (2011). Towards improving construction labor productivity and project's performance., Alexandria Engineering Journal, 50(4), 321-330.

DOI: 10.1016/j.aej.2012.02.001

Google Scholar

[3] Hendrickson, C. (1998).

Google Scholar

[4] Alinatwi, H., Mwakali, J., and Hansson, B. (2007). Factors affecting the productivity of building craftsmen – studies of Uganda., Journal of Construction Engineering and Management, 13(3), 169-176.

DOI: 10.3846/13923730.2007.9636434

Google Scholar

[5] O'Brien, J. J. (1998) Construction Change Orders. McGraw Hill, New York.

Google Scholar

[6] Jang, H. , Lee, S. , and Choi, S. (2007). Optimization of floor-level construction material layout using genetic algorithms., Automation. Construction. , 16 (4 ), 531–545.

DOI: 10.1016/j.autcon.2006.09.006

Google Scholar

[7] Koskela, L., and Howell, G., (2001), Reforming project management: the role of planning, execution and controlling, Proceedings of the 9th International Group for Lean Construction conference, Kent Ridge Crescent, Singapore, 6-8 August, (2001).

Google Scholar

[8] Assaf, S. A., Al-Khalil, M. & Al-Hazmi, M. (1995) Causes of delays in large building construction projects. Journal of Construction Engineering and Management, ASCE, 11(2), pp.45-50.

DOI: 10.1061/(asce)0742-597x(1995)11:2(45)

Google Scholar