Multi-Task Assignment 0-1 Programming Model and Algorithm Based on the Improved Contract Net Protocol

Article Preview

Abstract:

For the problem of multi-task assignment based on the contract net protocol, this paper improved the traditional contract net protocol after analyzing its defects ,such as broad bidding scope and low efficiency etc. The research proposed a method of screening the bidders for each task by using distance matrix in task distribution ,employed the 0-1 programming model established to determine the successful bidders for each task in bidding process. Meanwhile, the study applied the auction mechanism to realize the dynamic assignment of multi-task, provided a concrete model algorithm and analyzed the performances of the algorithm proposed as well. The results show that the model algorithm effectively improves the overall performances of the task assignment system.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1376-1383

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Smith R G. : IEEE Trans on Computer, Vol. 29C-12( 1980), pp.1104-1113.

Google Scholar

[2] Cao Z Q, Zhang B and Tan M. : Robots, Vol. 23-5(2001) pp.450-454, In Chinese.

Google Scholar

[3] DIAS M B, ROBERT Z, NIDHI K, et al.: Proceeding of the IEEE, Vol. 94-7(2006) pp.1257-1270.

Google Scholar

[4] BRIAN P G, MAJA J M.: IEEE Trans on Robotics and Automation, Vol. 18-5(2002) pp.758-768.

Google Scholar

[5] Thistle J G.: Discrete Event Dynamic Systems: Theory and Applications, Vol. 10-1(2000) pp.131-156.

Google Scholar

[6] Gao Z J, Yan G Z and Ding G Q.: Computer Engineering, Vol. 31-10(2005) pp.19-21. In Chinese.

Google Scholar