p.1184
p.1188
p.1192
p.1197
p.1203
p.1207
p.1212
p.1218
p.1223
Optimization of Construction Method for Shijiazhuang Xinbai Subway Station
Abstract:
To choose an appropriate construction scheme for subway, it,s feasible to use fuzzy optimization theory and comprehensively consider the security of four construction methods as well as such factors as environmental influence, construction period, construction difficulty and construction cost, etc. to set up a mathematical model for the construction method of subway station. An analysis is made on the impact of group-effect in the excavation construction of pilot tunnel presented in PBA construction method on arch crown settlement and ground surface settlement, and a study is made on the arch crown settlement and ground surface settlement caused by the four construction methods in construction process. In addition, a contrastive analysis is made to draw a conclusion that PBA construction method is the most suitable construction method for Xinbai Square Subway Station in Shijiazhuang.
Info:
Periodical:
Pages:
1203-1206
Citation:
Online since:
July 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: