Optimization of Construction Method for Shijiazhuang Xinbai Subway Station

Article Preview

Abstract:

To choose an appropriate construction scheme for subway, it,s feasible to use fuzzy optimization theory and comprehensively consider the security of four construction methods as well as such factors as environmental influence, construction period, construction difficulty and construction cost, etc. to set up a mathematical model for the construction method of subway station. An analysis is made on the impact of group-effect in the excavation construction of pilot tunnel presented in PBA construction method on arch crown settlement and ground surface settlement, and a study is made on the arch crown settlement and ground surface settlement caused by the four construction methods in construction process. In addition, a contrastive analysis is made to draw a conclusion that PBA construction method is the most suitable construction method for Xinbai Square Subway Station in Shijiazhuang.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1203-1206

Citation:

Online since:

July 2014

Keywords:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wanbo QU, Xinrong LIU, Ruijin HUANG and Mingzhong LIU, in:Railway Engineering, (2012). in Chinese.

Google Scholar

[2] Ruijie CHANG, in:Urban Rapid Rail Transit, (2010). in Chinese.

Google Scholar

[3] Wanying HUANG, Jianxin LIU, in:Journal of Guangdong Communications Polytechnic, (2013). in Chinese.

Google Scholar