Force Analysis of the Middle Wall in Multi-Arch Tunnel under Central Hole + CRD Method

Article Preview

Abstract:

arch tunnel construction in the presence of construction mechanics often unclear, the lack of systematic design and construction of the theory can learn. Harbin Clinic Road thesis double-arch tunnel project as the basis, the construction process through its hole + CRD using the finite element simulation analysis and on-site monitoring measurement data processing, engineering arch tunnel song used in the wall study the mechanical properties.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1188-1191

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] C. Zhang, X. T. Feng, H. Zhou: International Journal of Rock Mechanics and Mining Sciences, Vol. 52 (2012), pp.139-162.

Google Scholar

[2] A. Thurston: Orthopaedics and Trauma, Vol. 27 (2013), pp.332-341.

Google Scholar

[3] F. M. P. Leclère, F. Unglaub: Neurochirurgie, Vol. 58 (2012), pp.309-313.

Google Scholar

[4] W. Feng, R. Huang: Tunnelling and Underground Space Technology, Vol. 32 (2012), pp.190-197.

Google Scholar

[5] L. Jing: International Journal of Rock Mechanics and Mining Sciences, Vol. 40 (2003), pp.283-353.

Google Scholar

[6] D. Chowdhury: Physics Reports, Vol. 529 (2013), pp.1-197.

Google Scholar

[7] C. Zangerl: International Journal of Rock Mechanics and Mining Sciences, Vol. 45 (2008), p.1195.

Google Scholar