Study on Risk Trend Assessment of Metro Tunnel Crossing Underground Pipeline Based on Partial Connection Number
Abstract:
A model of risk trend assessment for metro tunnel crossing underground pipelines is proposed in this paper based on the partial connection number. This paper fully considered the certainty and uncertainty of the index and used "partial connection number method" to analyze the risk developing trend and its sort of metro tunnel crossing underground pipelines. A case study was performed on a metro tunnel engineering of Shenzhen Line 9. The results showed that this model considered the dynamic characteristics of risk, enriching the contents of risk assessment of underground engineering, which can provide a reference for the risk management.