Auger Bored Piles Application Works in the Subway

Article Preview

Abstract:

Pile Foundation Construction jobs are usually wet process has contaminated a large, long duration, the pile of inconsistent quality, cost out. And long bored piles to adapt to a variety of complex geological conditions, but not the impact of water table, is widely used in various projects of the foundation engineering, this according to subway construction in Kunming, the application of experience, a brief description length screw pile construction anti-interpolation technology.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1301-1305

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Technology specification for excavating piles bored with long auger inserted reinforcing steel cage after jacked concrete. DB11/T582-2008. Beijing Municipal Construction Committee. (2008).

Google Scholar

[2] Deng Minghua. Application of Long Auger Boring Filling Pile in Soft Foundation Treatment of Dongting Lake Area. Hunan Hydro & Power. 2005 (06).

Google Scholar