Experimental Study on the Offshore Positioning and Installing of Large Caisson

Article Preview

Abstract:

The traditional method of the offshore caisson positioning and installing is using the barge or floating crane, but for the large caisson with 26,000 tons, the method is unable to achieve apparently. In this paper, the offshore location and installation of the large caisson with mooring line system and anchor cable system are studied. The research gets the wave and flow conditions results as well as the related and advertent items, which provide the reference for large caisson positioning and installation as well as the similar engineering construction technology.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2129-2133

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Qian Wang, Yong Gang Tan: Advanced Materials Research Vol. 368-373, (2012), p.1491.

Google Scholar

[2] Wave Model Test Regulation(JTJ/T 234-2001)Ministry of Transport of the People's Republic of China.

Google Scholar

[3] Kang Song-tao, Hong Ling-yun: China Harbour Engineering No. 4 (2013), p.53.

Google Scholar