[1]
Qu Junbiao Li Tao: FLAC3D calculates application in the pit precipitation of the deep foundation[A] Building of Shanxi(2006).
Google Scholar
[2]
Du Mingyu Ruan Qinsong: Construct and appraise analyzing to the environmental impact around in the deep foundation pit of subway station[A] Railway building(2013).
Google Scholar
[3]
Wang Jianxiu Wu Lingao: The deep foundation pit precipitation of subway station brings out and subsides the mechanism and computing technology[A]Rock mechanics and project journal(2009).
Google Scholar
[4]
Zhao Ming Yu Kailin: Appraise system to study in pit precipitation environmental impact of the foundation[A] Construction technology (2011).
Google Scholar
[5]
Linin LuJianyong: Foundation pit precipitation analyze to peripheral building and qualification on influence of surface subsidence [A] Architecture science(2010).
Google Scholar
[6]
LouRongxiang ZhouNianqing: The pit precipitation numerical simulation of deep foundation stands in Subway Line No. 11 Xujiahui of Shanghai [A] Underground space and project journal (2011).
Google Scholar
[7]
Zhang Zhengshuan : The pite precipitation of the foundation causes the crack of building around analysis [A] Project quality (2012).
Google Scholar
[8]
Wang Wenfeng: To the predict building subside caused by the pit precipitation of thefoundation and give prevention measure[A] Reconnoitre in the railway(2013).
Google Scholar