Error Analysis of the Settlement Observation

Article Preview

Abstract:

This document bases on settlement observation of a residential district which is influenced by the subway construction in Shanghai China.Because of the long-term measurement,there were some equipment boxes installed on the top of the settlement marks.Thus making the leveling rod in an leaning angle to the right or left direction relative to the sight line.In order to know the error of the measurement,we make analysis of the error.And it also can be a reference for other surveyings when encounter this similar circumstance.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2801-2804

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] L.Q. Zhang, Y.Q. Niu, Introduction to settlement measurement method of error analysis and control, J. SCIENCE & TECHNOLOGY INFORMATION, Vol. 05, 102-103, (2012).

Google Scholar

[2] Y.Y. Xu,Y. Luo, Surveying, third ed., ChinaCommunications Press, (2009).

Google Scholar

[3] Ministry of Construction of the People's Republic of China, JGJ8-2007 Code for deformation measurement of building and structure, China Architecture and Building Press, 2007(in Chinese).

Google Scholar

[4] S.H. Wang, Error Theory and measurement adjustment, TONGJI UNIVERSITY PRESS, China, (2010).

Google Scholar