Discussion on the Application of GPS Technology in Bridge Construction Plane Control Net and in Survey of Bridge Axis Lofting

Article Preview

Abstract:

The article introduces that the GPS technology in the bridge construction survey turns the bridge axis lofting spots and the construction control net into the overall net after completing the plane control net, to centrally gathering information and simultaneously adjustment processing, so as to satisfy the high accuracy request of the bridge axis lofting.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2842-2847

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Dajie Liu, Yimin Shi, JingJun Guo. Global Positioning System (GPS) and data processing[M]. Tongji University Press, 1996(In Chinese).

Google Scholar

[2] Xiangyuan Kong, Jimin Guo. Control Surveying (upper and lower volumes). Wuhan University Press, 2006(In Chinese).

Google Scholar

[3] GB/T18314-2001, Global Positioning System (GPS) surveying standard(In Chinese).

Google Scholar

[4] CJJ73-97, Global Positioning System City measurement techniques regulations(In Chinese).

Google Scholar

[5] CJJ8-99, Cities measurement standard(In Chinese).

Google Scholar