Improved BP Neural Network Model Applied in Settlement Analysis

Article Preview

Abstract:

According to the settlement and deformation of pavement in subway construction, the paper improved on the basis of gray system theory and BP neural network forecasting model. The method is adapted to modified residual prediction model to predict with engineering examples. It provides decision-making basis for construction engineering and monitoring.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2848-2852

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Jvlong Deng. Gray theory [M]. Wuhan:Huazhong University of Science and Technology press, (2002).

Google Scholar

[2] Sifeng Liu, Yaoguo Fang. Grey system theory and its application [M]. Beijing:Science Press, (2004).

Google Scholar

[3] Teng Huang, Jingling Sun, Jianyue Tao. Subsidence monitoring and analyzing in subway tunnel construction[J]. JOURNAL OF SOUTHEAST UNIVERSITY, 2006, 36(2): 262~266.

Google Scholar

[4] Yi Fang, Xianghong Hua, Haiying Li. The application of grey neural network model to deformation forecasting of buildings [J]. ENGINEERING OF SURVEYING AND MAPPING, 2008, 17(2): 51~57.

Google Scholar

[5] Lee-Ing Tong, Yi-Hui Liang. Neural network and grey analysis and forecast the field failure data for repairable system[J]. Journal of Gray System, 2002, 14(4): 341~344.

Google Scholar

[6] Si-Feng Liu, Jeffrey Forrest. Advances in Grey Systems Theory and Its Application[C]. Proceedings of 2007 IEEE International Conference on Grey Systems and Intelligent Services, Nanjing, 2007: 1~6.

DOI: 10.1109/gsis.2007.4443227

Google Scholar

[7] Nai-ming Xie, Si-feng Liu. Discrete grey forecasting model and its optimization[J]. Applied Mathematical Modelling, 2009, 33(2): 1173-1186.

DOI: 10.1016/j.apm.2008.01.011

Google Scholar