Numerical Analysis of Construction Method in Shallow-Buried Large-Section Loess Tunnel

Article Preview

Abstract:

To research the deformation regularity of large section loess tunnel in construction procession with different construction methods, 3D Numerical Simulation is applied and the large-section loess tunnel of highway is taken as an example. Comparing deformation regularity of surrounding rock in three types of construction method conditions, the research results show that:The CRD method takes precedence in the condition of the convergence of surrounding rock is large. The both sides heading method takes precedence in the condition of ground surface settlement is large.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

997-1000

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Jinwen Li: Shanxi Science & Technology of Communications. Vol. (216) (2012), pp.37-38.

Google Scholar

[2] Hongyue Zhan and Qicai Wang: Journal of Water Resources Architectural Engineering. Vol. 7(4) (2009), pp.117-120.

Google Scholar

[3] China Merchants Chongqing Communications Research & Design Institute: Code for Design of Highway Tunnel (JTG D70-2004) (China Communications Press publications, Beijing 2004).

Google Scholar

[4] Shichun Wang: Classification of Tunnel Rock (Southwest Jiaotong University Press publications, Chendu 2007).

Google Scholar