Security of secondary lining is of utmost importance to tunnel engineering quality as the main bearing structure and the last water-prevent line for rock types I, II, III. Tunnel lining with dislocation and cracks is one of the most serious defects to secondary lining. Based on the case of Goujiagou tunnel, the potential threat is listed. The pre-stressed regulation scheme is designed, and the parameters are determined. The loose surrounding rock pressure on lining is calculated by P's theory. Based on the results, the numerical simulation model is build by means of FES code ANSYS; and the internal pressure before and after the reinforcement is analyzed. According to the above-mentioned research results, this paper calculated the safety factor, and checked the structure strength. Research results indicate that the regulation design is feasible and the pre-stressed parameters are appropriate. The results will provide reference to design for dislocation and cracks of tunnel lining.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1019-1023

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Tingjin LIU, Hehua Zhu, Wenqi Ding. Chinese Journal of rock mechanics and engineering Vol23 (2), 75-78. (in Chinese).

Google Scholar

[2] Zhi-ping Nie, Shaohua Zhu, Wenguang Zhao, et al. Journal of Huazhong University of Science and Technology: Urban Science Edition, 2003 (9) : 42一45. (in Chinese).

Google Scholar

[3] Zhixiong Qian, Yongxiang Yang, Ying-ren Zheng. Chongqing Construction, 2001 (3): 13-17. (in Chinese).

Google Scholar

[4] Yong Wang. Geotechnical Engineering Technique, 2004(10): 258~262. (in Chinese).

Google Scholar

[5] Yong-hua Liu. Study on safety estimation of express-way tunnel [D]. Chengdu: Southwest Jiaotong University , (2004).

Google Scholar

[6] Chuning Wang, Mingfeng Lei, Li-min Peng. Journal of Railway Science and Engineering, 2011, 8(3) : 53一58. (in Chinese).

Google Scholar

[7] Mingfeng LEI, Li-min Peng, Cheng-hua Shi, et al. Chinese Journal of Underground Space and Engineering , 2008 , 4 (7): 1 357一1 362. (in Chinese).

Google Scholar