The Randomness of the Critical Chain Technology

Article Preview

Abstract:

Randomness is an accidental, an event with a probability demonstrated uncertainty. We know CPM method does not consider the resource constraints. This deficiency can be solved by the critical chain technology. We can get more than a critical chain. In order to solve this problem, We can use the optimal method of stochastic process to schedule critical chain.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2246-2249

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Li Zhijian, In: Factors affecting the construction schedule and control measures . Architectural Design Management, 2010. 2.

Google Scholar

[2] Do not Lebanon, In: Critical Chain Project Management buffer estimate of and monitoring methods. Huazhong University of Science and Technology , 2012. 4.

Google Scholar

[3] WenZhou Yan, Qingquan Yuan. In: Project Management, Shaanxi Science and Technology Press , 2006. 1.

Google Scholar

[4] Xie Xuemei, In: Software development projects IRSE buffer settings and simulation based on critical chain. The Journal of China University of Posts and Telecommunications, 2010, 17.

DOI: 10.1016/s1005-8885(09)60598-7

Google Scholar

[5] Lin Jingjing. In considered irreplaceable resource identification and critical chain buffer setting method. Southwest Jiaotong University , (2011).

Google Scholar