p.2297
p.2301
p.2307
p.2313
p.2317
p.2322
p.2326
p.2333
p.2339
Project Management for the Construction of a Large Scale Modified UNITANK Wastewater Treatment Plant
Abstract:
As more and more work is organized through projects and programmers, project management is becoming increasingly important. Aiming to ensure the project quality, control building progress within a short period and make the cost effective, full-process project management for the construction of a large scale modified UNITANK wastewater treatment plant (WWTP) was conducted and introduced in detail in this paper. Long term operation results indicate that the Qianfeng II WWTP shows good pollutants removal performance and stable operation ability, which demonstrates that these project management methods are practical and could be popularized for the similar projects in the future.
Info:
Periodical:
Pages:
2317-2321
Citation:
Online since:
July 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: