Project Management for the Construction of a Large Scale Modified UNITANK Wastewater Treatment Plant

Article Preview

Abstract:

As more and more work is organized through projects and programmers, project management is becoming increasingly important. Aiming to ensure the project quality, control building progress within a short period and make the cost effective, full-process project management for the construction of a large scale modified UNITANK wastewater treatment plant (WWTP) was conducted and introduced in detail in this paper. Long term operation results indicate that the Qianfeng II WWTP shows good pollutants removal performance and stable operation ability, which demonstrates that these project management methods are practical and could be popularized for the similar projects in the future.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2317-2321

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] R. Atkinson: Int J Proj Manag. Vol. 17 (1999), p.337.

Google Scholar

[2] Munns, B. Bjeirmi: Int J Proj Manag. Vol. 14 (1996), p.81.

Google Scholar

[3] R. Chiva, J. Alegre: J Prod Innovat Manag. Vol. 26 (2009), p.424.

Google Scholar

[4] J. Yao, N. Zhu: Energ Buildings. Vol. 43 (2011), p.2197.

Google Scholar