Evaluation of the Construction Project Based on Factor Analysis

Article Preview

Abstract:

The accuracy of the results of the evaluation after the construction project is largely dependent on the choice of the evaluation method is reasonable and scientific. In this paper, the current methods for the evaluation of projects for a more systematic study were compared and analyzed; and proposed the construction of the factor analysis method for the analysis of project evaluation, and gives two reasons for the application of this method .

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2438-2441

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ji Fa Gu: Decision Sciences and Systems Engineering . Vol. 18, No. 6(1990), p.20~26(In Chinese).

Google Scholar

[2] Dasgupta A K,Pearce D.Cost—Benefit Analysis.Theory and Practice. Vol. 38, No. 15(1978), p.65~68.

Google Scholar

[3] Economic Development Task Force in China: Management World . Vol. 4(1993), p.176~185(In Chinese).

Google Scholar

[4] Squire L,Tak H.Economic Analysis of Projects.Johns Hopkins,(1975).

Google Scholar

[5] Chankong V,Haimes Y Y.Muhiple Objective Decision Making:Theory and Methodology.New York: Elsevier,1983.

Google Scholar

[6] Saaty T L.The Analytic Hierarchy Process,New York:MeGraw—HLL,(1980).

Google Scholar

[7] Bao Liu, etc.: Systems Engineering. Vol. 2, No. 2(1984), p.23~30(In Chinese).

Google Scholar

[8] Shi Zhong Chen, Bang Chan Lai and Xiao Hong Chen: Systems Engineering. Vol. 23, No. 6(2005), p.99~100(In Chinese).

Google Scholar

[9] Yong Le Liu, Yan Jing Hu and Fang Jie Zhang: Statistics and Decision. Vol. 7, No. 2(2005), p.65~66(In Chinese).

Google Scholar