Dynamic Risk Assessment of Underground Engineering Construction

Article Preview

Abstract:

Risk assessment is generally static. However, in the process of construction, there actually are plenty of changing variables; the result of the risk assessment should also change simultaneously. Real-time dynamic risk assessment is required to find problems and guide the construction at any time. It is hard for manual dynamic assessment because of the heavy workload to consider every changeable factor. Assistant computer system with automatic abnormal data tracking and risk assistant analysis is necessary. This paper will introduce the dynamic risk assessment function of this system.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2631-2634

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Qihu Qian, Xiaoli Rong: Chinese Journal of Rock Mechanics and Engineering Vol. 27-4(2008), 649. In Chinese.

Google Scholar

[2] Liugang Zhou, Haixiang Wang: RAILWAY INVESTIGATION AND SURVEYING Vol. 33-6 (2007), p.91. In Chinese.

Google Scholar

[3] Huai Jin, Peiyin Lv, Yaode Xu: Urban Rapid Rail Transit Vol. 25-5 (2012), p.42. In Chinese.

Google Scholar

[4] Xuande Yao, Mengshu Wang: Engineering Science Vol. 11-7 (2009), p.86. In Chinese.

Google Scholar