Application of Stress-Free Status Control Method in Bridge Construction Control

Article Preview

Abstract:

The paper describes the basic principles of stress-free status control method and application in construction control of various phased construction bridge.Through a series of engineering example calculation and analysis shows that: the method can solve all kinds of problems in bridge construction control calculation directly and efficiently, its application and promotion can promote the whole bridge construction control level of progress.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1412-1415

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shunquan Qin. The construction control of bridge-the theory and practice of stress-free status method[M]. Ministry of transport of the People's Republic of China. (2006). (in Chinese).

Google Scholar

[2] Shunquan Qin. The construction of bridges in steps by stress-free status method[J]. Bridge Construction. 2008, (1): 8-14. (in Chinese).

Google Scholar

[3] Yongren Pan, Lichu Fan. Backward analysis method of long span suspension bridges for erection of stiffening girders[J]. Journal of Tongji University. 2001,29(5): 510-514. (in Chinese).

Google Scholar

[4] Gaiwei Mei, Min Zhang, Shuxing Zhou. Solution on cable force and segmental camber in arch bridge construction by modified inverted method. 2009, 28(2): 200-205. (in Chinese).

Google Scholar

[5] Jianmin Zhang, Jielian Zheng, Lucheng Xiao. Calculation method for optimizing the installation process of concrete-filled steel tube arch bredge. 2005,18(2): 40-44. (in Chinese).

Google Scholar