[1]
A. Imai, E. Nishimura, S. Papadimitriou, The Dynamic Berth Allocation Problem for a Container Port, Transportation Research Part B. 35 (2001) 401-417.
DOI: 10.1016/s0191-2615(99)00057-0
Google Scholar
[2]
A. Imai, X. Sun, E. Nishimura, S. Papadimitriou, Berth Allocation in a Container Port: Using a Continuous Location Space Approach, Transportation Research Part B. 39 (2005) 199-221.
DOI: 10.1016/j.trb.2004.04.004
Google Scholar
[3]
E. Nishimura, A. Imai, S. Papadimitriou, Berth Allocation Planning in The Public Berth System By Genetic algorithms, European Journal Of Operational Research. 131 (2001) 282-292.
DOI: 10.1016/s0377-2217(00)00128-4
Google Scholar
[4]
A. Imai, E. Nishimura, S. Papadimitriou, Berth Allocation with Service Priority, Transportation Research Part B. 37 (2003) 437-457.
DOI: 10.1016/s0191-2615(02)00023-1
Google Scholar
[5]
A. Imai, E. Nishimura, M. Hattori, S. Papadimitriou, Berth Allocation at Indented Berths For Mega-Containerships, European Journal of Operational Research. 179 (2007) 579-593.
DOI: 10.1016/j.ejor.2006.03.034
Google Scholar
[6]
D.S. Xu, C.L. Li, J.Y.T. Leung, Berth Allocation with Time-Dependent Physical Limitations on Vessels, European Journal of Operational Research. 216 (2012) 47-56.
DOI: 10.1016/j.ejor.2011.07.012
Google Scholar
[7]
N. Umang, M. Bierlaire, Ilaria. Vacca, Exact and Heuristic Methods to Solve the Berth Allocation Problem in Bulk Ports, Transportation Research Part E. 54 (2013) 14-31.
DOI: 10.1016/j.tre.2013.03.003
Google Scholar
[8]
V.H. Barros, T.S. Costa, A.C.M. Oliveira, L. A. N. Lorena, Model and Heuristic for Berth Allocation in Tidal Bulk Ports with Stock Level Constraints, Computers & Industrial Engineering. 60 (2011) 606-613.
DOI: 10.1016/j.cie.2010.12.018
Google Scholar
[9]
N. Kaveshgar, N. Huynh, S.K. Rahimian, An Efficient Genetic Algorithm for Solving the Quay Crane Scheduling Problem, Expert Systems with Applications. 39 (2012) 13108-13117.
DOI: 10.1016/j.eswa.2012.05.091
Google Scholar
[10]
C.J. Ting, K.C. Wu, H. Chou, Particle Swarm Optimization Algorithm for The Berth Allocation Problem, Expert Systems with Applications. 41 (2014) 1543-1550.
DOI: 10.1016/j.eswa.2013.08.051
Google Scholar
[11]
A. Imai, H.C. Chen, E. Nishimura, S. Papadimitriou, The Simultaneous Berth and Quay Crane Allocation Problem, Transportation Research Part E. 44 (2008) 900-920.
DOI: 10.1016/j.tre.2007.03.003
Google Scholar
[12]
L.Y. Song, T. Cherrett, W. Guan, Study on Berth Planning Problem in a Container Seaport: Using an Integrated Programming Approach, Computers & Industrial Engineering. 62 (2012) 119-128.
DOI: 10.1016/j.cie.2011.08.024
Google Scholar
[13]
D. F. Chang, Z. H. Jiang, W. Yan, J. L. He, Integrating Berth Allocation and Quay Crane Assignments, Transportation Research Part E. 46 (2010) 975-990.
DOI: 10.1016/j.tre.2010.05.008
Google Scholar
[14]
X.L. Han, Z.Q. Lu, L.F. Xi, A Proactive Approach for Simultaneous Berth and Quay Crane Scheduling Problem With Stochastic Arrival and Handling Time, European Journal of Operational Research. 207 (2010) 1327-1340.
DOI: 10.1016/j.ejor.2010.07.018
Google Scholar
[15]
I. Vacca, M. Salani, M. Bierlaire, An Exact Algorithm for the Integrated Planning of Berth Allocation and Quay Crane Assignment, Transportation Science. 47(2) (2013) 148-161.
DOI: 10.1287/trsc.1120.0428
Google Scholar
[16]
Z.H. JIN, N. LI, Optimization of Quay Crane Dynamic Scheduling Based on Berth Schedules in Container Terminal, Journal of Transportation Systems Engineering and Information Technology. 11 (2011) 58-64.
DOI: 10.1016/s1570-6672(10)60123-7
Google Scholar
[17]
C.X. Yang, X.J. Wang, Z.F. Li, An Optimization Approach for Coupling Problem of Berth Allocation and Quay Crane Assignment in Container Terminal, Computers & Industrial Engineering. 63 (2012) 243-253.
DOI: 10.1016/j.cie.2012.03.004
Google Scholar
[18]
P. Legato, R. Trunfio, F. Meisel, Modeling and Solving Rich Quay Crane Scheduling Problems, Computers & Operations Research. 39 (2012) 2063-(2078).
DOI: 10.1016/j.cor.2011.09.025
Google Scholar
[19]
O. Unsal, C. Oguz, Constraint Programming Approach to Quay Crane Scheduling Problem, Transportation Research Part E. 59 (2013) 108-122.
DOI: 10.1016/j.tre.2013.08.006
Google Scholar
[20]
M.H. Elwany, I. Ali, Y. Abouelseoud, A heuristics-based solution to the continuous berth allocation and crane assignment problem, Alexandria Engineering Journal. 52 (2013) 671-677.
DOI: 10.1016/j.aej.2013.09.001
Google Scholar