Tunnel Construction Dust Monitoring and Dust Control Technology of High Altitude and High and Cold Area

Article Preview

Abstract:

In order to improve the high altitude harsh construction environment, study tunnel construction dust concentration and distribution law of different construction section, using the membrane filter dust method to achieve the dust concentration of different section, using the statistical to analysis the origin and distribution law, putting forward different dust control measures for different construction stages, to improve the high altitude tunnel construction environment. The results of dust prevention and control of high altitude region are of great significance.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

703-708

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wang xinghua, Plateau permafrost tunnel engineering research, Beijing, China railway Publishing House.

Google Scholar

[2] Pang laolong. Methods Analysis on Dust Control after Tunnel Blasting [J]. Transport Vision.

Google Scholar

[3] Chen Zhi-qiang, The Research on Dust Prevention and Control in The Tunnel Construction with Drilling and Blasting Method[D], Shandong University Master's Thesis. 2008. 11.

Google Scholar

[4] Liu yuliang, The construction Technique Study ofthe Tunnel in High Altitude and Severe Frigid Region[D], Tinjin University Master's Thesis. 2004. 6.

Google Scholar

[5] Yang An-jie, Tunnel Wet Concrete-shot Technology in Permafrost Region[J], China Railway Science. 2004. 2: 141-144.

Google Scholar