Realization of FCB Function in 350MW Subcritical Units with 35% Capacity Bypass

Article Preview

Abstract:

In this paper, a new designed FCB (Fast Cut Back) control strategy has been applied in a 350MW subcritical coal-fired unit. The FCB test carried on 350MW units under 50% load and 100% load condition is presented.The result of test shows that the units can realize the FCB function without any manual involvement and the safety of units is effectively improved.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

674-677

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Z. X. Lu, Thoughts of reliability of power from 8. 14 blackouts of US and Canada, China Power, no. 12, 2003, pp.1-5.

Google Scholar

[2] L. D. Wang and J. H Yao, Successful application of FCB and new implementation scheme, Process Automation instrumentation, no. 6, 2004, pp.48-52.

Google Scholar

[3] W. Z. Feng, FCB test of 900MW supercritical unit, China Power, no. 2, 2005, pp.74-77.

Google Scholar

[4] X. K. Wen and P. Kang, Exploration of FCB function of the units in Guizhou Province, Guizhou Electric Power Technology, no. 4, 2005, pp.1-3.

Google Scholar

[5] H. Chen, Processing experience of 600MW supercritical unit FCB, Thermal Power Generation, no. 6, 2006, pp.62-63.

Google Scholar

[6] J. H. Yao, Discussion on several problems in FCB, China Power, no. 5, 2007, pp.59-62.

Google Scholar

[7] C. Q. Shen and X. Y. Zhou, FCB function and its application in power grid recovery, Shanghai electric power, no. 3, 2007, pp.251-254.

Google Scholar