5T Information Fusion System Based on Train Technology Scheme Design

Article Preview

Abstract:

On the train parts of 5T system at present all kinds of fault real-time monitoring the relevance of the weak, poor information sharing, centralized monitoring problem not in time, the system can achieve 5T effective integration of information system, information real-time delivery, 5T information fusion and 5T information fusion integrated query and statistical analysis and other functions through the acquisition of 5T system data, to train vehicle as the object of management, in order to train car number as the only connection identifier, fusion 5T information resources, to establish a global view of train vehicle safety monitoring information model. To improve the level of security early warning and fault analysis ability is of great significance.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1229-1232

Citation:

Online since:

August 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] (LIU Ruiyang. Train Coach Diagnosis System[J]. China Railway Science 2007, 28(2): 126-131. in Chinese).

Google Scholar

[2] (ZhOU Ke, Lv Min, Wang Gang, Ren Bingyin. Monitoring Data Transmission Technology in 5T System Based on Message [J]. China Railway Science, 2008, 29 (5): 113-118. in Chinese).

Google Scholar

[3] (LI Yuanfu. Research on Information Fusion Technology of Railway 5T System[J]. Group Economics Research, 2007(33): 202-202. in Chinese).

Google Scholar

[4] (WANG Xin, Li Ying. Optimization of THDS System in 5T Resources Reorganization[J]. Railway Vehicles, 2008, 46(7):29-31. in Chinese).

Google Scholar

[5] (AI Lifeng, LIU Chunhuang, DU Yanhua. Research on Model-Driven Web Services Composition Methodology for 5T System Integration[J]. China Railway Science, 2007, 28(4): 117-124. in Chinese).

Google Scholar

[6] (ZHANG Heng. The Integrated Use of Granite Along the Qinghai-Tibet Railway Section 5T System[J]. Railway Vehicles, 2008, 46(3):40-41. in Chinese).

Google Scholar

[7] (ZHAO Changbo, Cheng Lei. To Investigate the Comprehensive Use of 5T System[J]. Railway Vehicles, 2008, 46(12):18-21. in Chinese).

Google Scholar