The Confirmation of Closure Jacking Force in Continuous Rigid Frame Bridge

Article Preview

Abstract:

The theory deduces the formula of closure jacking force in the closure of mid-span in the continuous rigid bridge, and introduced the computation and accomplishment of jacking force in continuous rigid bridge, taking the example of Anwen Bridge.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

987-993

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Li liankan: Structural Mechanics (1), High Education Press (1996).

Google Scholar

[2] Xu junlan: Constructive Control of the Long-span Bridge, Renmin Jiaotong Press (2000).

Google Scholar

[3] Wu changqi , Yang jiahua and Han fenghua: Construction of Prestressed Concrete Bridge, Renmin Jiaotong Press (1981).

Google Scholar

[4] Fan lichu: Bridge Engineering (1) , Renmin Jiaotong Press (2001).

Google Scholar