Abstract:

This project is the construction and demolition program of the double-pole scaffolding for the exterior decoration of Building No.1 and No.2 of Wanda Plaza in an inland city. The exterior walls of ground floor stores are mainly comprised of granite columns, lacquer finishes, GRC plates, 8+8 toughened laminated glass canopy and other decorative items, with the highest elevation of 17.4m. Since other construction units need to dig electricity trenches and bury cables at a distance of 1.7m to the wall, the erection of the scaffolding should be limited to 1.5m from the wall.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

103-106

Citation:

Online since:

September 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] JGJ130-2011 Construction of steel tubular scaffold safety specifications.

Google Scholar

[2] Yuhong Zhao, Construction Technology, China Electric Power Press.

Google Scholar

[3] Kopl M. Halperin, Michael McCann, An evaluation of scaffold safety at construction sites, Journal of Safety Research Volume 35, Issue 2, 2004, Pages 141–150.

DOI: 10.1016/j.jsr.2003.11.004

Google Scholar

[4] Tao Zeng, Explore of using technology to the construction scaffolding housing construction, Operators and managers. 2014(10).

Google Scholar

[5] Weili Dang, Explorer of attached lifting scaffolding construction technology, Theoretical studies of urban construction 2014(8).

Google Scholar