Numerical Analysis of Roof Pre-Splitting Roadway Effect in Incline Coal Seam

Article Preview

Abstract:

Roof pre-splitting roadway is a new technology in roof induced rock burst prevention and control of incline coal seam. With the purpose of increasing rock burst prevention and control effective, FLAC3D numerical simulation software was used to analyze stress distribution characteristics and roof pre-splitting effect and the layout of the roof pre-splitting roadway parameters. The results showed that the roof pre-splitting roadway changed roof and floor stress distribution, the stress concentration degree is high in the zone of roof and floor around pre-splitting roadway and the two ribs of pre-splitting roadway, which made the roof strength weakened and easy to break, avoiding a large overhang in the process of mining and rock-burst; The roof pre-splitting roadway led to stress concentration in the range of 5 ~ 10 m, roof effective weakening range 12 m, so the distance of two roof pre-splitting roadway should be more than 20m. The research provided the reference basis for rock burst prevention by roof pre-splitting roadway in the incline coal seam group mining.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1899-1902

Citation:

Online since:

September 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Nishiwaki K, Kagami S. High Frequency Walking Pattern Generation based on Preview Control of ZMP, IEEE International Conference on Robotics and Automation. (2006).

DOI: 10.1109/robot.2006.1642104

Google Scholar

[2] Chen Nan and so on. For the field of industrial and highly interconnected, TI launched a new Sitara ARM9 microprocessor. [J]. Global Electronics, 2010 (5) 86-87.

Google Scholar

[3] Vision Heading Navigation Based on Navigation Curve [A]. Proceedings 2010 International Conference on Intelligent Computing and Integrated Systems[C]. (2010).

DOI: 10.1109/iciss.2010.5657096

Google Scholar

[4] Chen Nan and so on. For the field of industrial and highly interconnected, TI launched a new Sitara ARM9 microprocessor. [J]. Global Electronics, 2010 (5) 86-87.

Google Scholar

[5] Jonghoon ZMP Park, Youngil Youm. General ZMP Control for Bipedal Walking. IEEE International Conference on Robotics and Automation. (2007).

DOI: 10.1109/robot.2007.363870

Google Scholar

[6] ZHANG Jing, WANG Wanliang, XU Xinli, et al. Hybrid particle-swarm optimization for multi-objective flexible job-shop scheduling problem. Control Theory &Applications, vol. 29, no. 6, pp.30-37, (2012).

Google Scholar

[7] NING Tao. Study on Application of Hybrid Quantum Algorithm in Vehicle Routing Problem. Dalian: Dalian Maritime University, (2013).

Google Scholar

[8] Tran Quang Tuan, Phan Xuan Minh. Adaptive Fuzzy Model Predictive Control for non-minimum phase and uncertain dynamical nonlinear systems, Journal of Computers, vol. 7, no. 4, pp.1014-1024, (2012).

DOI: 10.4304/jcp.7.4.1014-1024

Google Scholar