Prediction of Nuclear Power Project Cost Based on Improved Non-Equidistant GM (1,1) Model and Exponential Regression Model

Article Preview

Abstract:

Today, faced with the problem of international energy supply difficulties, due to the nuclear power’s fewer of its resources consumption, little environmental pollution and other advantages, it has become one of the essential pillars of the electricity supply. This paper analyzed from a comprehensive localization of nuclear power plants, then use the non-equidistant GM (1,1) model and the exponential regression model to predict the construction cost of nuclear power, and do the error analysis. The conclusion that by increasing the degree of localization of domestic nuclear power construction, which can effectively reduce the cost of building nuclear power plants conclusions.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3489-3492

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Hans-Holger Rogner. World outlook for nuclear power Energy. Strategy Reviews[J], 2012: 291-295.

Google Scholar

[2] Wang Xinxin. Analysis of China's nuclear power development status and countermeasures new period. Energy-saving technology [J], 2010, 28(1): 60-64.

Google Scholar

[3] ZhouZaiqi, Lu Buliang, Zhou Yu. Issues discussed nuclear power development. Energy technology [J], 2009, 30(3): 164-172.

Google Scholar

[4] XuLianyi. Localization of the AP1000 nuclear island main equipment. China Nuclear Industry [J], 2007, 6.

Google Scholar

[5] MeiHong, Sun Zexin. Non equidistant GM(1, 1) model to improve the analysis and forecasting . Hohai University [J], 2010, 38(5): 569-574.

Google Scholar

[6] Jinghong Jun, Suru Rong , Su Ting. Research on deformation prediction model. Settlement of High Embankment Soil Mechanics [J], 2007, 28(8): 1762-1766.

Google Scholar