The Research for Assembling Double Circuit Steel Tube Tower with New inside Pulling Wire

Article Preview

Abstract:

Double Circuit Steel Tube Tower has a large size structural and a heavy weight of components, so the construction of tower becomes more difficult. This article uses the Midas software to simulate the Process of Inside Pulling Wire for Double Circuit Steel Tube Tower erection in windy weather and no windy weather, Researching the influence of the new lifting system and the original lifting system on the whole of lifting system. Through the stress analysis and simulation formajor rigging, we can know which lifting ways can be used when the horizontal displacement of the derrick has or has not strict restrictions, or the lifting weight has been restricted when the Wind load is too strong. New lifting system can lift very heavy tower material and has little affect by windy weather, especially suite for assembling large size structural and heavy weight of components tower.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

4852-4855

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zheng Jianchao. On the development trends of power technologies [J]. Power System Technology, 1997, 21(11): 4-10.

Google Scholar

[2] Yi Lidong,Lü Shirong.Study and application of construction key technologies for 750 kV transmission and transformation project [J].Power System Technology, 2006, 30(3): 51-56.

Google Scholar

[3] Zhang Jianfeng. Inside Pulling Wire with Suspension derrick in Erection of Towers [J] . Shanxi electric power technology, 1994 , 14(1) : 23-32.

Google Scholar

[4] ZHENG Huai-qing, XIONG Zhi-ming, WANG Xi-chen LI Zhen-yu. Tower Assembling and Erection Technologies for 1000 kV UHV AC Transmission Line[J]. Power System Technology, 2008, 32(20): 15-19.

Google Scholar

[5] Xiong Zhiming,Niu Yonghua,Shao Lidong.Key technique adopted in construction of 500kV transmission line across Yangtze iver at Jiangyin[J].Power System Technology, 2006, 30(1):28-34.

Google Scholar

[6] Li Qinglin. Analysis on Suitability of Layout Mode of Lifting Rope in Erection of Towers in Decomposition Way [J]. electric power construction, 2009, 21(9): 17-21.

Google Scholar