p.4835
p.4840
p.4844
p.4848
p.4852
p.4856
p.4860
p.4864
p.4869
The Research for Assembling Double Circuit Steel Tube Tower with New inside Pulling Wire
Abstract:
Double Circuit Steel Tube Tower has a large size structural and a heavy weight of components, so the construction of tower becomes more difficult. This article uses the Midas software to simulate the Process of Inside Pulling Wire for Double Circuit Steel Tube Tower erection in windy weather and no windy weather, Researching the influence of the new lifting system and the original lifting system on the whole of lifting system. Through the stress analysis and simulation formajor rigging, we can know which lifting ways can be used when the horizontal displacement of the derrick has or has not strict restrictions, or the lifting weight has been restricted when the Wind load is too strong. New lifting system can lift very heavy tower material and has little affect by windy weather, especially suite for assembling large size structural and heavy weight of components tower.
Info:
Periodical:
Pages:
4852-4855
Citation:
Online since:
September 2014
Authors:
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: