p.5216
p.5220
p.5224
p.5227
p.5231
p.5235
p.5239
p.5244
p.5248
The Limit of Kirin Factory Ore Body by the Dynamic Multi-Plans in Huize Lead-Zinc Mine
Abstract:
Huize lead-zinc mine is one of the typical representative of large rich lead-zinc deposits in the Sichuan-Yunnan-Guizhou lead-zinc mineralization district. It plays a key role in the development of Yunnan non-ferrous metals industry. In this paper, on the basis of enough analysis and research to Kirin factory Ore Body’s geologic feature in Huize lead-zinc mines, using reasonable economic parameters, combined with the actual situation of the orebody and break-even analysis, optimizing cut-off grade, it delineates the ore body by breakeven grade and comprehensive grade and achieves a dynamic multi-plans orebody for the purpose of the service life of mine.
Info:
Periodical:
Pages:
5231-5234
Citation:
Online since:
September 2014
Authors:
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: