The Limit of Kirin Factory Ore Body by the Dynamic Multi-Plans in Huize Lead-Zinc Mine

Article Preview

Abstract:

Huize lead-zinc mine is one of the typical representative of large rich lead-zinc deposits in the Sichuan-Yunnan-Guizhou lead-zinc mineralization district. It plays a key role in the development of Yunnan non-ferrous metals industry. In this paper, on the basis of enough analysis and research to Kirin factory Ore Body’s geologic feature in Huize lead-zinc mines, using reasonable economic parameters, combined with the actual situation of the orebody and break-even analysis, optimizing cut-off grade, it delineates the ore body by breakeven grade and comprehensive grade and achieves a dynamic multi-plans orebody for the purpose of the service life of mine.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

5231-5234

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Murphy J: AAPG Bulletin, Vol. 79 (1995) No. 4, p.594.

Google Scholar

[2] Bolotnik, D. N, Sarkisov, G. G, Sharifullin: Proceedings of the European Petroleum Conference, (1998) No. 2, p.45.

Google Scholar

[3] Lemon A M, Jones NL: Computers& Geosciences, Vol. 29 (2003) No. 3, p.547.

Google Scholar

[4] Kavouras M, Masry S. An information system for geoscience: Proceedings of 8th International Symposium on Computer Assisted Catography, (1987), p.336.

Google Scholar

[5] White. Matthew J, Saequsa, Hiromitsu: Materials Research Society Symposium Proceedings, Vol. 8(2004) No. 7, p.533.

Google Scholar

[6] Wu Qiang, Xu Hua: Computers& Geosciences, Vol. 29 (2003) No. 4, p.507.

Google Scholar