Optimization Design of Excavator Working Device

Article Preview

Abstract:

It has heavy workload, imprecision, not intuition, and other shortcomings by utilizing the traditional methods to optimize excavator working device (bucket). Structural optimization of main working parts excavator (bucket) is performed by finite element analysis technology. Defect of bucket is found out on the basis of static analysis results. Optimization scheme is put forward to meet the job requirements.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

610-613

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Ding Hua, Zhu Maotao, Zhao Shanshui. The finite element analysis of hydraulic mining mechanical arm, J. China journal of highway and transport, 2003, 16 (4): 118-120.

Google Scholar

[2] Michael JRyken, JudyM. Applying virtual reality techniques to the interactive stress analysis ofa tractor liftarm, J. Finite Elements in Analysis and Design, 2000, 35(2): 141-155.

DOI: 10.1016/s0168-874x(99)00062-1

Google Scholar

[3] Cheng Kai, Li Shanhui, Liu Shuxue. Finite element analysis of loader working device, J. Journal of agricultural machinery, 2008 (2): 3-4.

Google Scholar

[4] Wu Gang. Optimization design of 7. 5 m3 hydraulic excavator shovel working device, J. Journal of mechanical engineering, 2002 (6): 23-25.

Google Scholar

[5] Deng Zilong, Gao Cailu, Fu Yue. Digging bucket strength analysis, J. Journal of Liao Ning university of petroleum and chemical, 2007 (12): 2-3.

Google Scholar