Analysis and Application of Turbine Outages Kept Boiler of FCB Function in the Philippines Mariveles Power Plant
Abstract:
This paper mainly introduces the system configuration of the Philippines Mariveles power plant, the difficulty and key points of the unit fast cut load (Fast Cut Back - FCB) control function were analyzed, and the boiler pressure control valve (Pressure Controlling Valve - PCV) discharge, turbine bypass opening coordination decrease pressure, integrate the override control, a fixed value servo and other control strategy, the possible problems in the process of test are sorting and analysis, and put forward effective solution, ensure the successful application of turbine outages kept boiler of FCB function, lay solid foundation for the safe and stable operation of the power grid.
Info:
Periodical:
Pages:
661-664
Citation:
Online since:
October 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: