[1]
Brans J, Mareschal B. How to select and how to rank projects: the PROMETHEE method.European Journal of Operational Research, 1986(2): 228-238.
DOI: 10.1016/0377-2217(86)90044-5
Google Scholar
[2]
Rudolf Vetschera, Adiel Teixeira. A PROMETHEE-based approach to portfolio selection problems [J]. Computers & Operations Research, 2012(39): 1010-1020.
DOI: 10.1016/j.cor.2011.06.019
Google Scholar
[3]
Halouani N, Chabchoub H. PROMETHEE-MD-2T Method for Project Selection [J]. European Journal of Operational Research, 2009(195): 841-849.
DOI: 10.1016/j.ejor.2007.11.016
Google Scholar
[4]
M. E. Fontana, D. C. Morais. Using PROMETHEE V to Select Alternatives so as to Rehabilitate Water Supply Network with Detected Leaks[J]. Water Resource Manage, 2013(27): 4021-4037.
DOI: 10.1007/s11269-013-0393-1
Google Scholar
[5]
Majid Behzadian, Seyyed Mahdi. PROMETHEE Group Decision Support System and the House of Quality [J]. Group Decis Negot , 2013(22): 189-205.
DOI: 10.1007/s10726-011-9257-3
Google Scholar
[6]
Goumas M, Lygerou V. An extension of the PROMETHEE method for decision making in fuzzy environment: Ranking of alternative energy exploitation projects [J]. European Journal of Operational Research, 2000(3): 606-613.
DOI: 10.1016/s0377-2217(99)00093-4
Google Scholar
[7]
Masoud, Akbar. Application of Fuzzy Goal Programming & F-PROMETHEE Approaches in Evaluating and Selecting the Best Suppliers in Supply Chain[J]. Journal of Basic and Applied Scientific Research. 2013(2): 1115-1127.
Google Scholar
[8]
Cathy M, Johan S, Klaas D.B. PROMETHEE and AHP: The design of operational synergies in multicriteria analysis: Strengthening PROMETHEE with ideas of AHP[J]. European Journal of Operational Research, 2004 (2): 307-317.
DOI: 10.1016/s0377-2217(03)00153-x
Google Scholar
[9]
W.X. Li, G.M. Zhang. The Weights Determination of Extended PROMETHEE II Method Based on Interval Numbers [J]. Chinese management science, 2010(18): 102-106.
Google Scholar
[10]
W.X. Li, G.M. Zhang. Based on the grey interval number for α-PROMETHEE method's research and application [J]. Systems engineering and electronics, 2010(32): 781-783.
Google Scholar
[11]
D.Y. Li, D.W. Cheung, X.M. Shi, V. Ng. Uncertainty reasoning based on cloud models in controllers[J]. Computers and Mathematics with Applications, 1998(3): 99-123.
DOI: 10.1016/s0898-1221(97)00282-4
Google Scholar
[12]
X. J. Yang, L. Zeng, F. Luo, S.X. Wang, Cloud hierarchical analysis, Journal of Information & Computational Science , 2010 (12): 2468-2477.
Google Scholar
[13]
H.X. Sun, Qiang Z. Interval number fuzzy VIKOR method [J]. Fuzzy systems and mathematics, 2011(10): 122-125.
Google Scholar
[14]
M. E. Fontana,D. C. Morais. Using PROMETHEE V to select alternatives so as to rehabilitate water supply network with detected leaks [J]. Water Resource Manage, 2013(27): 4021-4037.
DOI: 10.1007/s11269-013-0393-1
Google Scholar