Study on Energy Saving from Intermittent Operation of Air-Conditioning System

Article Preview

Abstract:

According to the principles of air and heat balance and aiming at air-conditioning load time delay mechanism, the boot time for air-conditioning system operation is controlled to satisfy the demand of air-conditioned environment without wasting energy [1].

You might also be interested in these eBooks

Info:

Periodical:

Pages:

542-545

Citation:

Online since:

October 2014

Authors:

Keywords:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Xing Hongbin, Ma lei. Several Energy-Saving Air-Conditioning Control System [J]. Applied Energy Technology 1997 (01).

Google Scholar

[2] Jiang Yi, Zhao Qing Chu. Room Frequency Response Method to Calculate the Intermittent Air Conditioning Load [J]. Architectural Science 1987 (02).

Google Scholar

[3] Zhao Zhian single send level. Intermittent Air-Conditioned Office Building Design Type Air Conditioning Load Simplified Calculation Method [J]. Architectural Technology Communications (HVAC) 1990 (02).

Google Scholar