Aerial Steel Platform Overall Lifting Process and Stress Calculation

Article Preview

Abstract:

High-rise super large aerial platform project construction has been a greater danger, How to ensure the quality of components assembled and the safety of the construction project is worthy of study. Through finite element analysis on construction conditions of steel structures, ensures the hydraulic synchronous lifting and construction technology of high-altitude hoisting and assembly, greatly reduced the difficulty of installation, quality, safety, cost, schedule is guaranteed.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

222-228

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xu Wenwu, Liu Kun, Ding Xiaoheng. Hydraulic overall lifting technology of steel truss, J. architectural technology. 2008(9).

Google Scholar

[2] Chang Han, Guo Zhengxing, Hu Mingpo. 30m span steel corridor overall lifting technology, J. architectural technology. 2009(10).

Google Scholar

[3] Pang Jinghui, Jia Jinwen, Zhang Tao. Hydraulic overall lifting technologyin the application of beichen district administrative center project, China Construction Metal Structure. 2009(5).

Google Scholar