Injection-Production Parameters Optimization Research SAGD Production Stage

Article Preview

Abstract:

Steam assisted gravity drainage (SAGD) technology has been industrialized popularization and application in our country, according to the characteristics of Xing group I SAGD experimental zone in liaohe oilfield, SAGD production stage injection-production parameters such as the operating pressure, Sub - Cool control, steam injection rate, steam dryness, production factor are studied and selected.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

513-516

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Wu Yongbin, MC the Max mountain, Sun Xinge Ma Desheng, hong-zhuang wang. Double horizontal well steam assisted gravity drainage steam injection wellbore key parameter prediction model [J]. Journal of petroleum exploration and development. 2011: 481-488.

Google Scholar

[2] David H. -S. Law, Tawfik N. Nasr, William K. Good,. Field-Scale Numerical Simulation of SAGD Process With Top-Water Thief Zone. SPE 65522, (2000).

DOI: 10.2118/65522-ms

Google Scholar

[3] P. Egermann, G. Renard, E. Delamaide. SAGD Performance Optimization Through Numerical Simulations: Methodology and Field Case Example. SPE 69690, (2001).

DOI: 10.2118/69690-ms

Google Scholar