Study on Mapping Techniques of Bill of Material Supporting Complex Assembly Line Material Feeding

Article Preview

Abstract:

In complex assembly process, By using the conversion mapping relation of “MBOM-WBOM-FBOM”, consistency mapping and integrity control of material feeding information for complex assembling line was realized, and data describing model that can reflect the feature of assembly process was provided for delicacy management. At last, the rationality of BOM models above and feasibility of transfer approach were proved through actual case.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

5012-5017

Citation:

Online since:

November 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zeng Hong-xin. Flow Assembly Production Planning and Scheduling for Mechanical Products Based on State Tree and Time Dispose[D]. Wuhan: Huazhong University of Science and Technology, (2005).

Google Scholar

[2] Huang Xue-wen, Fan Yu-shun. Research on BOM Views and BOM View Mapping Model. [J]. Journal of Mechanical Engineering , 2005, 41(4): 97-102.

DOI: 10.3901/jme.2005.04.097

Google Scholar

[3] STONEBRAKER P W.Restructuring the bill of material for productivity:a strategic evaluation of product configuration[J].International of Production Economics,1996,45(1—3): 251—260.

DOI: 10.1016/0925-5273(95)00147-6

Google Scholar