Based on Perspective of the Owner of the Design Change Control of the Construction Project

Article Preview

Abstract:

Continuous construction project cycle is long, large investment and a lot of participants, the internal and external factors, involving a lot of unpredictable change easily to project design. This paper respectively from the perspective of the owner, designer, contractor, this paper expounds the formation of design change, analyze the design change might brings to the project schedule, cost, and combined with practical engineering cases and widely existing problems, and from the owners' perspective, how to realize the control and management of design change are expounded, and gives corresponding solutions.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

5153-5156

Citation:

Online since:

November 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yuan Di. The countermeasure research of real estate project design change management[J],goods and quality, (2013)174.

Google Scholar

[2] Meng Yumei. Engineering design change control measures, (2013)136-138.

Google Scholar

[3] Ling Li. Contract management of engineering changes and claims, (2013)79-80.

Google Scholar

[4] Liwen Yang. Talk from the perspective of cost control design change management [J], modern property management, (2013)48-49.

Google Scholar