Based on Perspective of the Owner of the Design Change Control of the Construction Project
Abstract:
Continuous construction project cycle is long, large investment and a lot of participants, the internal and external factors, involving a lot of unpredictable change easily to project design. This paper respectively from the perspective of the owner, designer, contractor, this paper expounds the formation of design change, analyze the design change might brings to the project schedule, cost, and combined with practical engineering cases and widely existing problems, and from the owners' perspective, how to realize the control and management of design change are expounded, and gives corresponding solutions.