Modern Planning and Control and Virtual Verification of Process Continuity of a New Production Line

Article Preview

Abstract:

The paper describes one practical implementation of the Digital Factory concept – design of a new production line using modern planning method of virtual testing and control of processes. The project covered graphical facility design, detailed design of operations and material flow simulation. This case study shows facility process planning, commission and in the end finding the optimization rules and corrective actions to increase existing casting line throughput. All phases of the project were carried out using simulation software, duration of the project was 6 months. Simulation software WITNESS has been used for material flow simulation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

167-172

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Z. Wang et al., Off-line programming of Spot-Weld Robot for Car-Body in White Based on Robcad, International Conference on Mechatronics and Automation. (2007).

DOI: 10.1109/icma.2007.4303640

Google Scholar

[2] A. I. Korshunov, Determination of structural and technological complexity of engineering products, Automation and modern technology. (2006).

Google Scholar

[3] R. Dillmann et al., Robotik in Deutschland – Lehre, Forschung und Entwicklung, Shaker (1998).

Google Scholar

[4] Y. R. Nikitin, Diagnostic models of mechatronic modules and analysis techniques, Procceding of 2-d International Conference Advances in Mechatronics. (2007).

Google Scholar

[5] J. N. Pires, Industrial Robots Programming, Building Applications for the Factories of the Future, Springer. (2007).

Google Scholar

[6] B. Frankovič — I. Budinská, Creation of Intelligent Distributed Control System Based on Multi–Agent Technology, Journal of Electrical Engineering. 60-1 (2009).

Google Scholar

[7] A.I. Korshunov, Constructive-technological complexity of technological conversion fitter assembly work, Build in mechanical engineering, instrument. (2007).

Google Scholar

[8] R. Cep, A. Janasek, J. Valicek et al., Testing of greenflear ceramic cutting tools with an interrupted citting, Technical gazette. (2011).

Google Scholar

[9] M. I. Jambak et al., Robotic Modeling and Simulation, Theory and Application. InTech. (2010).

Google Scholar

[10] D. Hladek, J. Vaščák, P. Sinčák, Multi–Robot Control System for Pursuit–Evasion Problem, Journal of Electrical Engineering. 60-3 (2009).

Google Scholar

[11] A. W. Moore, Robot Motion Planning. School of Computer Science, Carnegie Mellon University, (2007).

Google Scholar