Study on Stress and Deformation Performances of the Spliced Cement Formwork Reinforced by FRP

Article Preview

Abstract:

For permanent cement-base formwork, due to stay-in-place with concrete during all the service life and minor size of the end surface, the splicing methods of traditional formworks are not adapted to be used. In allusion to natures of the cement-base formwork, this paper presents ten types of splicing methods. For each method, a group of specimens are prepared and whose capacity and deformation performance are investigated. And meanwhile, stress and deformability of the full specimens without joint are researched under the same conditions. Through above splicing experiments, some reliable splicing method is obtained. The experimental results provided by this paper present a gist for investigation and application of the permanent cement-base formwork.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

764-768

Citation:

Online since:

July 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] T. Viney: Concrete (London), Vol.39 (2005), pp.10-11

Google Scholar

[2] X.R. Song: Experimental study on GRC plate used as permanent formwork. Report ,Beijing (2003), In Chinese

Google Scholar

[3] X.R. Song, J.L. Gao, J.Y. Qu: Journal of Beijing University of Technology, Vol.34 (2008), pp.708-713, In Chinese

Google Scholar

[4] X.R. Song, D. Zhang, W. Dai: Mechanical properties of concrete slab combined with formwork, Proceedings of 17th Structure Engineering Conference, Vol.2 (2008), pp.115-119, In Chinese

Google Scholar

[5] W. Dai. GRC Splicing Formwork Test and GRC/Concrete Composite Plate Test. Master's Degree Thesis of NCUT, Beijing (2010), In Chinese

Google Scholar

[6] National Technical Committee on Cement Products of Standardization Administration of China. GB/T 7019-97 Fiber Cement Products Test Methods. China Standard Press, Beijing (1997), In Chinese

Google Scholar