Equivalent Stress Cycles Based on District Heating Operation

Article Preview

Abstract:

We investigated supply water temperature of the district boiler between 2006 and 2014.And calculated the design life cycles of heating pipeline based on the district boiler as the heat source. Then superposed the number of the design life cycles caused by pipelines accidents and district boiler of the main trunk lines, distribution lines and subscriber connection line, we obtained the design life cycles of different heating pipes. This result can provide a basis for fatigue damage analysis of heating pipe fittings.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

295-299

Citation:

Online since:

January 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Wang Fei, Zhang Jianwei. Engineering Design of Buried Heating pipe[M]. China Architecture&building press, 2007, 1(1): 89-92. (in Chinese).

Google Scholar

[2] Tangshan thermal company. CJJ/T81-2013. Technical Specification for Directly Buried Hot-water Heating Pipeline in City[S]. Beijing: China Architecture&building press, 2013. (In Chinese).

Google Scholar

[3] Lu Xifeng. The operation of the heating system and regulation[J]. Heihe Science and Technology. 2003(01).

Google Scholar

[4] Design and Installation of Preinsulated Bonded Pipe System for District HeatingBS EN13941: (2003).

Google Scholar

[5] Rand's treaty (Ed. ), He Ping, Wang Gang, (eds). The district heating handbook [M] Harbin industrial university press, 1998: 5.

Google Scholar

[6] Fu Huimin, Yin Gang. The tiny sample method to determine the fatigue limit[J]. Mechanical strength. 1999(02).

Google Scholar

[7] Zhang Jiwang, Lu Liantao, Zhang Yanbin, Zhang Weihua. Fatigue limit assessment method of small sample[J]. Journal of Harbin Engineering University. 2010(03).

Google Scholar