Dispatching Technology Application in India Large Scale Blackout

Article Preview

Abstract:

Scheduling technology plays an important role in avoiding the occurrence of large scope blackout. India "7.30", "7.31" blackout indicates dispatching mechanism is not reasonable. It is more important that it violates scheduling and supervision direction. The network defense mechanism is not perfect. It is lack of dynamic analysis and safety evaluation capacity. Dispatching technology can be a basis for China's high-voltage power grid construction, dispatching management and establishing a perfect accident recovery plan.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1409-1412

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zhenya Liu. The special high-voltage power grid [M]. Beijing: Chinese Economy Publishing House, 2005: 114-116.

Google Scholar

[2] Amew.Power system operation corporation limited [R]. New Delhi : National Load DespatchCentre,2012-07-30T11:50.

Google Scholar

[3] Amew.Power system operation corporation limited [R]. New Delhi :National Load Despatch Centre,2012-07-31T18:30.

Google Scholar

[4] Yin Yonghua, Guo Jianbo, Zhao Jianjun, etal.Prelimonary analysis of large scale blackout in interconnected North America power grid on August 14 and lessons to be drawn[J]. Power System Technology,2003,27(10):8-11(in Chinese).

Google Scholar

[5] He Dayu. Rethinking over 8. 14, US-Canada blackout after one year [J]. Power System Technology,2004,28(21):1-5(in Chinese).

Google Scholar

[6] Liu Yongqi, Xie Kai, Analysis on blackout of interconnected North America power grid occurred on Aug. 14, 2003 from the viewpoint of power system dispatching[J].Power System Technology,2004, 28(8):10-15,45(in Chinese).

Google Scholar

[7] Gao Xiang,Zhuang Kanqin,Sun Yong.Lessons and enlightenment from blackout occurred in UCTE Grid on November 4,2006[J].Power System Technology,2007,30(1):25-31(in Chinese).

Google Scholar