Engineering Design and Recheck Computation of Trench-Buried Inverted Siphon

Article Preview

Abstract:

This paper provides design scheme for Guodi river trench-buried inverted siphon engineering, and universal finite element calculation software is adopted to carry out force analysis inverted siphon, researching variation law of the inverted siphon’s stress and displacement in operating process. The calculation results further shown design scheme’s rationality and safety, this provide the reliable basis for engineering design.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

549-552

Citation:

Online since:

December 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] SL191-2008: Design Code for Hydraulic Concrete Structures(China Water Conservancy and Hydropower Press, China 2008)(in Chinese).

Google Scholar

[2] G.X. Li: Advanced Soil Mechanics(Tsinghua University Press, China 2005)(in Chinese).

Google Scholar

[3] B.F. Zhu: Finite Element Method Principle and Application(China Water Conservancy and Hydropower Press, China 1998)(in Chinese).

Google Scholar

[4] X. CH. Wang: Finite Element Method(Tsinghua University Press, China 2003)(in Chinese).

Google Scholar

[5] H.Y. Li, W.D. Tian, H.X. Yan. Inverted Siphons(China Water Conservancy and Hydropower Press, China 2006)(in Chinese).

Google Scholar