[1]
K. Kálna, K. Ulrich, Konštrukcia a navrhovanie. Učebnétexty pre kurzy zváračských technológov, VÚZ, Bratislava, ( (2001).
Google Scholar
[2]
K. Ulrich, R. Koleňák, S. Karvanská, Skúšanie zvarových spojov, Bratislava, STU Bratislava, ( 2006) 256.
Google Scholar
[3]
V. Uher, I. Vitáloš, J. Kováč, Zváracie metódy a zariadenia. Ostrava, ZEROSS, (2000) 616.
Google Scholar
[4]
P. Brziak, Materiály a ich spávanie sa prizváraní. III. Doplnkové a prepracované vydanie. Bratislava. Výskumný ústav zváračsky – Priemyselný inštitút SR, (2009) , 356.
Google Scholar
[5]
M. Hatala, J. Zajac, R. Čep, I. Orlovský, Research of the technological parameters importance for plasma arc the rmalcutting. Applied Mechanics and Materials, (2012) 110-116.
DOI: 10.4028/www.scientific.net/amm.110-116.3742
Google Scholar
[6]
Z. Hutyrová, M. Harničarová, J. Zajac, J. Valíček, J. Mihok, Experimental study of surface roughness of wood plastic composites after turning. Adv Materials Research, 856, 108-112.
DOI: 10.4028/www.scientific.net/amr.856.108
Google Scholar
[7]
J. Duplák, I. Orlovský, M. Čuma, Comprehensive expression of durability for the selected cutting tools in comparison wit hstandard ISO 3685 22. Advanced Science Letters, 19 , (2013) 460-463.
DOI: 10.1166/asl.2013.4745
Google Scholar
[8]
J. Zajac, Z. Hutyrová, A. Tarasovičová, Assessment of statistical signification of factors by machining inhomogeneous materials - WPCApplied Mechanics and Materials, 308, (2013) 165-16.
DOI: 10.4028/www.scientific.net/amm.308.165
Google Scholar
[9]
M. Kočiško, J. Novák-Marcinčin, P. Baron, J. Dobránsky, Utilization of progressive simulation software for optimization of production systems in the area of small and medium companies. Tehnicki Vjesnik, 19 , (2012) 983-986.
Google Scholar
[10]
M. Sadílek, J. Kratochvil, J. Petru, Cutting tool wear monitoring with the use of impedance layers. Tehnicki vjesnik – technical gazette, 21, (2014) 639-644.
Google Scholar
[11]
B. Kaczmarska, W. Gierulski, S. Luściński, The Issue of Reducing the Expectations Gap in Implementing of MRP. Manufacturing and Industrial Engineering, 4, (2012) 38-40.
Google Scholar