BIM-Risk System for Chinese International Contractors

Article Preview

Abstract:

As the external environment of the international construction project has become increasingly complex, risk management is emphasized in the project management. BIM(Building Information Model) has bring change to the Construction Industry in China. It has contributed to the schedule and cost management. However, BIM is not widely used to solve the problem of risk management. This thesis cites the possibility about BIM application to risk management and evaluates the progress it may bring to the process of risk management. Furthermore, a BIM-Risk System is proposed for Chinese international contractors to solve some major risks the international contractors may face. By using this system, the level of the project risk management will significantly improve. Then the barriers and the potential problems of applying BIM to risk management in China are analyzed. The BIM application to risk management has great value to be further researched.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

181-186

Citation:

Online since:

January 2015

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yali Zhang, Naiding Yang, Zhaojun Yang, The research of Project Life-Cycle Risk Management, J. Scientific Management Research, (2004).

Google Scholar

[2] Zhiliang Ma, The problems and solution of BIM application in China, J. Informatization, 2010: 12-15.

Google Scholar

[3] Jinlian Xu, Enterprise Risk Management, first ed., (2000).

Google Scholar

[4] Bosen He, Shuibo Zhang, Jiantao Xu, Tian Zhang, Management Model Risk Analysis of international construction project, J. Construction management and general contract, (2006).

Google Scholar

[5] Jiayuan Wang, Liyin Shen, Xiaodong Hao, The research of Schedule delay risk of public construction project, (2006).

Google Scholar

[6] Jianping Zhang, Optimization and dynamic management of building construction based on BIM and 4D, J. Informatization, 2010: 18-23.

Google Scholar

[7] Hua Huang, New method of cost control in construction design, J. Journal NeiJiang normal University, 2010. 10. 15.

Google Scholar

[8] Aijuan Wang, Modeling of schedule risk analysis for construction projects based on BIM, master thesis, Harbin Institute of technology, 2011. 6.

Google Scholar

[9] Qian Che, Early warning system of construction project schedule risk based on BIM, master thesis, Harbin Institute of technology, 2013. 6.

Google Scholar

[10] Shuang Liu, The application of BIM, J. Journal Architecture, 2008, 2: 100-101.

Google Scholar