Recourse Optimization of Construction on a Basis of the Frontal and Rhythmical Stream

Article Preview

Abstract:

In article is offered the method of calculation of a frontal and rhythmical stream, at which initial temporary operating conditions of crews periodically repeat (under a condition of continuous use of resources). It allows to provide the demanded duration of performance of work and the minimum quantity of resources.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

984-989

Citation:

Online since:

January 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Grabovyy, P.G. Osnovnyye napravleniya razvitiya zhilishchnogo stroitelstva v Rossii [The main directions of development of housing construction in Russia] (2011) Nedvizhimost: ekonomika i upravleniye, 1, pp.4-9.

Google Scholar

[2] Mishchenko, V.Y. Ekonomicheskaya effektivnost rekonstruktsii obyektov nedvizhimosti [Economic efficiency of reconstructing real estate projects] (2006) Promyshlennoye i grazhdanskoye stroitelstvo, 2, pp.50-51.

Google Scholar

[3] Chegotova, Ye.V. Raspredeleniye riskov mezhdu zastroyshchikom, tekhnicheskim zakazchikom i investorom [Distribution of risks between the builder, the technical customer and the investor] (2013).

Google Scholar

[4] Chegotova, Ye.V. Rol tekhnicheskogo zakazchika v organizatsii investitsionno-stroitelnoy deyatelnosti [Role of the technical customer in the organization of investment construction activity] (2012) Magazine of Civil Engineering, 29(3), pp.5-11.

Google Scholar

[5] Grabovyy, P.G., Malikova, I.P. Investitsionnaya privlekatelnost zhilishchno-kommunalnoy sfery [Investment appeal of the housing-and-municipal sphere] (2013) Effektivnoye antikrizisnoye upravleniye, 77(2), pp.66-72.

Google Scholar

[6] Rogalskaa, M., Bożejkob, W., Hejduckib, Z. Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008) Automation in Construction, 18(1), p.24–31.

DOI: 10.1016/j.autcon.2008.04.002

Google Scholar

[7] Ptukhin, I.A., Morozova, T.F., Rakova, K.M. Formirovaniye otvetstvennosti uchastnikov stroitelstva za narusheniye kalendarnykh srokov vypolneniya rabot po metodu PERT [Formation of responsibility of participants of construction for violation of calendar terms of performance of work on the PERT method] (2014).

Google Scholar

[8] Kuznetsov, S.M., Sirotkin, N.A., Legostayeva, O.A. Otsenka organizatsionno-tekhnologicheskoy nadezhnosti stroitelstva zdaniy i sooruzheniy [Assessment of organizational and technological reliability of construction of buildings and constructions] (2006).

Google Scholar

[9] Bolotin, S.A., Klimov, S.E. Strakhovaniye ushcherba ot nesvoyevremennogo vypolneniya stroitelstva na osnove statisticheskogo modelirovaniya [Insurance of damage upon untimely performance of construction on the basis of statistical modeling] (2004).

Google Scholar

[10] Zavadskas, E. K., Turskis, Z., Tamošaitiene, J. Risk assessment of construction projects (2010) Journal of Civil Engineering and Management, 16(1), p.33–46.

Google Scholar

[11] Barkalov, S.A., Kotenko, A.M., Fedorova, I.V. Zadacha kalendarnogo planirovaniya s ogranichennymi resursami pri nechetkikh prodolzhitelnostyakh rabot [Problem of scheduling with limited resources at indistinct durations of works] (2005).

Google Scholar

[12] Bolotin, S.A., Vikhrov, A.N., Gladiy, N. Ya. Regressionnoye raspredeleniye ushcherba pri otklonenii planiruyemykh i fakticheskikh kharakteristik vypolneniya rabot [Distribution of damage at the deviation of planned and actual characteristics of the executed works] (2006).

Google Scholar

[13] Gaevskaya, Z., Mityagin, S. Capital construction and noosphere genesis (2014) Applied Mechanics and Materials, 587-589, pp.123-127.

DOI: 10.4028/www.scientific.net/amm.587-589.123

Google Scholar

[14] Bolotin, S., Birjukov, A. Time Management in Drafting Probability Schedules for Construction Work (2013) World Applied Sciences Journal 23 (Problems of Architecture and Construction), 01-04, pp.112-118.

Google Scholar

[15] Seko, E. Optimization and the Dimensional Analysis in Structural Engineering Problems (2014) Advanced Materials Research, 945-949, pp.1236-1241.

DOI: 10.4028/www.scientific.net/amr.945-949.1236

Google Scholar

[16] Bolotin, S., Dadar, A., Ptuhina, I. Construction work tasks duration: pessimistic scenarios based on PERT method (2014) Advanced Materials Research, 945-949, pp.3026-3031.

DOI: 10.4028/www.scientific.net/amr.945-949.3026

Google Scholar

[17] Simankina, T., Popova, O. Neural network application for scheduling of building construction repair (2014) Applied Mechanics and Materials, 584-586, p.1944-(1950).

DOI: 10.4028/www.scientific.net/amm.584-586.1944

Google Scholar

[18] Simankina, T.L. Improvement of scheduling of resource-saving streams taking into account additivity of intensity of work of performers (2007) Thesis of candidate of technical sciences. SPbGASU. SPb, p.154.

Google Scholar