[1]
Grabovyy, P.G. Osnovnyye napravleniya razvitiya zhilishchnogo stroitelstva v Rossii [The main directions of development of housing construction in Russia] (2011) Nedvizhimost: ekonomika i upravleniye, 1, pp.4-9.
Google Scholar
[2]
Mishchenko, V.Y. Ekonomicheskaya effektivnost rekonstruktsii obyektov nedvizhimosti [Economic efficiency of reconstructing real estate projects] (2006) Promyshlennoye i grazhdanskoye stroitelstvo, 2, pp.50-51.
Google Scholar
[3]
Chegotova, Ye.V. Raspredeleniye riskov mezhdu zastroyshchikom, tekhnicheskim zakazchikom i investorom [Distribution of risks between the builder, the technical customer and the investor] (2013).
Google Scholar
[4]
Chegotova, Ye.V. Rol tekhnicheskogo zakazchika v organizatsii investitsionno-stroitelnoy deyatelnosti [Role of the technical customer in the organization of investment construction activity] (2012) Magazine of Civil Engineering, 29(3), pp.5-11.
Google Scholar
[5]
Grabovyy, P.G., Malikova, I.P. Investitsionnaya privlekatelnost zhilishchno-kommunalnoy sfery [Investment appeal of the housing-and-municipal sphere] (2013) Effektivnoye antikrizisnoye upravleniye, 77(2), pp.66-72.
Google Scholar
[6]
Rogalskaa, M., Bożejkob, W., Hejduckib, Z. Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008) Automation in Construction, 18(1), p.24–31.
DOI: 10.1016/j.autcon.2008.04.002
Google Scholar
[7]
Ptukhin, I.A., Morozova, T.F., Rakova, K.M. Formirovaniye otvetstvennosti uchastnikov stroitelstva za narusheniye kalendarnykh srokov vypolneniya rabot po metodu PERT [Formation of responsibility of participants of construction for violation of calendar terms of performance of work on the PERT method] (2014).
Google Scholar
[8]
Kuznetsov, S.M., Sirotkin, N.A., Legostayeva, O.A. Otsenka organizatsionno-tekhnologicheskoy nadezhnosti stroitelstva zdaniy i sooruzheniy [Assessment of organizational and technological reliability of construction of buildings and constructions] (2006).
Google Scholar
[9]
Bolotin, S.A., Klimov, S.E. Strakhovaniye ushcherba ot nesvoyevremennogo vypolneniya stroitelstva na osnove statisticheskogo modelirovaniya [Insurance of damage upon untimely performance of construction on the basis of statistical modeling] (2004).
Google Scholar
[10]
Zavadskas, E. K., Turskis, Z., Tamošaitiene, J. Risk assessment of construction projects (2010) Journal of Civil Engineering and Management, 16(1), p.33–46.
Google Scholar
[11]
Barkalov, S.A., Kotenko, A.M., Fedorova, I.V. Zadacha kalendarnogo planirovaniya s ogranichennymi resursami pri nechetkikh prodolzhitelnostyakh rabot [Problem of scheduling with limited resources at indistinct durations of works] (2005).
Google Scholar
[12]
Bolotin, S.A., Vikhrov, A.N., Gladiy, N. Ya. Regressionnoye raspredeleniye ushcherba pri otklonenii planiruyemykh i fakticheskikh kharakteristik vypolneniya rabot [Distribution of damage at the deviation of planned and actual characteristics of the executed works] (2006).
Google Scholar
[13]
Gaevskaya, Z., Mityagin, S. Capital construction and noosphere genesis (2014) Applied Mechanics and Materials, 587-589, pp.123-127.
DOI: 10.4028/www.scientific.net/amm.587-589.123
Google Scholar
[14]
Bolotin, S., Birjukov, A. Time Management in Drafting Probability Schedules for Construction Work (2013) World Applied Sciences Journal 23 (Problems of Architecture and Construction), 01-04, pp.112-118.
Google Scholar
[15]
Seko, E. Optimization and the Dimensional Analysis in Structural Engineering Problems (2014) Advanced Materials Research, 945-949, pp.1236-1241.
DOI: 10.4028/www.scientific.net/amr.945-949.1236
Google Scholar
[16]
Bolotin, S., Dadar, A., Ptuhina, I. Construction work tasks duration: pessimistic scenarios based on PERT method (2014) Advanced Materials Research, 945-949, pp.3026-3031.
DOI: 10.4028/www.scientific.net/amr.945-949.3026
Google Scholar
[17]
Simankina, T., Popova, O. Neural network application for scheduling of building construction repair (2014) Applied Mechanics and Materials, 584-586, p.1944-(1950).
DOI: 10.4028/www.scientific.net/amm.584-586.1944
Google Scholar
[18]
Simankina, T.L. Improvement of scheduling of resource-saving streams taking into account additivity of intensity of work of performers (2007) Thesis of candidate of technical sciences. SPbGASU. SPb, p.154.
Google Scholar