Abstract:

At present, many hydropower stations eliminate the expansion joints to solve the pipe leakage problem. It’s very important to control the welding environment temperatures in eliminating the final weld joint of the expansion joints. To address this problem, by adopting three-dimensional finite element model in studying the hydro project of Wanjiazhai, this paper analyzes the stress state of steel pipe in all welding environment temperatures in details and suggests the proper range of welding environment temperatures. Researchers suggest that May is suitable to perform welding.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

472-477

Citation:

Online since:

February 2015

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] J.Z. Fu, S.C. Zhang: Verification of Penstocks without Contraction Joints for the Lijiaxia Hydropower Station, Vol. 56 (1997) No. 3, p.41.

Google Scholar

[2] Z.R. Dong: Design and Nonlinear Analysis of Steel Lined Reinforced Concrete Penstock, (China Water Power Press, China 1998).

Google Scholar