Research on Upper Limit Increased of Mining in Coal Mining Face

Article Preview

Abstract:

In order to guarantee the safety of the coal mine, needing to leave in reasonable waterproof safety coal pillar. Aiming at the working face 3311 of Xuchang coal mine, this article based on the analysis to the basis of factors for improving the mining limit, using UDEC numerical simulation, the regulations of coal mining under buildings, railways and water bodies and historical experience to analyze crack-production ratio of the working face, study the height of water flowing fractured zone development, designing test mining program. Through the upper mining limit to liberate 160000t coal resources and to gain the obvious economic benefits, which provide important significance for other similar coal mines in coal field of North China area.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

846-850

Citation:

Online since:

March 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Chunying Guo, Yunlong Li and Junzhu Liu: China Mining Magazine. Vol. 04 (2010), pp.71-74. (In Chinese).

Google Scholar

[2] Yichuan Wu, Bingli Wang: Hebei coal mine. Vol. 03, (1990), pp.58-60. (In Chinese).

Google Scholar

[3] Zhenli Fan. The research of thick coal seam mining under complex water in Nalin River. Ph. D Thesis. Beijing: China University of Mining & Technology, 2013(In Chinese).

Google Scholar

[4] Dingtao Cao, Wenping Li: The Chinese Journal of Geological Hazard and Control. Vol. 01 (2014), pp.63-69. (In Chinese).

Google Scholar

[5] Weidong Lv, Xinqi Xu and Bo Jin: Coal Technology. Vol. 02 (2003), pp.39-41. (In Chinese).

Google Scholar

[6] State Bureau of Coal Industry, in: The regulations of coal pillar preservation and coal mining under buildings, railways and water bodies. Beijing: Coal Industry Press (2000).

Google Scholar

[7] Shan Gao: Coal Mining Technology. Vol. 01 (2014), pp.34-36. (In Chinese).

Google Scholar

[8] Yanqing Li. Study on the Prediction Method of Water-flowing Fractured Zone's Height and its Application. Ph. D Thesis. Xi`an: Xi`an University of Science and Technology, 2007(In Chinese).

Google Scholar

[9] Zengde Yin. The characteristics of overlying disrupted strata by extraction faliure and its application research. Ph. D Thesis. Shandong: Shandong University of Science and Technology, 2007(In Chinese).

Google Scholar

[10] Baogang Wang: Coal Technology. Vol. 06 (2003), pp.51-52. (In Chinese).

Google Scholar