Simulating Experiment of Casing Cementing with Pre-Expansion

Article Preview

Abstract:

Thermal recovery is a common and effective method for producing heavy oil. Casing failure is a serious problem in thermal recovery wells. In view of this problem, it is proposed the technique of casing cementing with internal pre-expansion for thermal recovery well. It refers to exert inner pressure on payzone production casing or heat payzone production casing to a certain temperature and make payzone production casing expand in cement solidifying period. We developed simulating experiment table according to field practice and pre-expansion cementing theory. It can simulate cementing technology with conventional, half warm-up and internal pre-pressurization cementing technology, also include steam injection and production process. The technique will be an important foundation for the following field tests and its application.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

851-854

Citation:

Online since:

March 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Li Zifeng, Ma Xingrui, Huang Wenhu et al. Mechanical analysis of casing in thermal recovery wells [J]. Engineering Mechanics, 1998, 15(2): 19-26.

Google Scholar

[2] Li Weizhong. The mechanism and prevention of casing damage in ultra thick oil well of Shuguang oilfield [J]. Drilling & Production Technology, 2003, 26(2): 55-57.

Google Scholar

[3] Jia Xuanhong, Liu Yu. Cause analysis and measures for casing failure in Liaohe heavy oil wells [J]. Special Oil & Gas Reservoirs, 2003, 10(2): 69-71.

Google Scholar

[4] Smith R. J, Alinsangan N S, Talebi S. Microseismic response of well casing failures at a thermal heavy oil operation [C]. Proceedings of the SPE/ISRM Rock Mechanics in Petroleum Engineering Conference, Irving, Texas, USA: Secioty of Petroleum Engineers Inc, 2002: 390-396.

DOI: 10.2118/78203-ms

Google Scholar

[5] Drilling Handbook (Party A) writing group. Drilling handbook (Party A) first volume [M]. Beijing: Petroleum Industry Press, (1990).

Google Scholar

[6] Li Zifeng. Casing cementing with half warm-up for thermal recovery wells [J]. Journal of Petroleum Science and Engineering, 2008, 61: 94-98.

DOI: 10.1016/j.petrol.2008.05.003

Google Scholar

[7] Li Zifeng, Yang Xinjun, Wang Zhaoyun, Tian Xinmin. Casing cementing with internal prepressurization for thermal recovery wells [J]. Engineering Mechanics. 2008, 25(6): 219-224.

Google Scholar

[8] Li Zifeng. Casing cementing with internal pre-pressurization for thermal recovery wells [J]. Journal of Canadian Petroleum Technology, 2008, 47(12): 1-6.

DOI: 10.2118/08-12-44

Google Scholar

[9] Lanzhou Institute of Chemical Phusics Chinese Academy of Sciences. Silicon oil [M]. Lanzhou: Gansu People Press, 1997: 190-194.

Google Scholar

[10] Li Qibo. Hydraulic equipments handbook [M]. Beijing: Metallurgical Industry Press, (1999).

Google Scholar