Research of Distribution Automation System FA Function Test Method

Article Preview

Abstract:

Feeder automation (FA) function is a very important part of distribution automation system (DAS). In this paper, the current main way to achieve the FA functions is introduced, and the testing method of FA function is studied, based on the requirements of the standard distribution automation systems. Meanwhile the standardized testing method and testing process is researched according to the characteristics of implementation. The paper also brings forward a set of feasible testing methods of FA function of DAS.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

653-657

Citation:

Online since:

March 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jian Liu, Jian-Li Ni, Yong-hui Deng. Distribution automation system[M]. China Water Power Press, (2009).

Google Scholar

[2] Wu-gai Yang, Mei Wen, Zhi-ping Zheng. The automation of distribution network[M]. China Water Power Press, (2004).

Google Scholar

[3] Qing-dong Feng, Wei-ming Mao. Distribution network automation technology and analysis of engineering example[M]. China Electric Power Press, (2009).

Google Scholar

[4] La-yuan Xu. Summary of distribution automation network in China[J]. Rural Electrification, 2009(3): 5-7.

Google Scholar

[5] Tang Chen, Zu-kang Zhao, Xing-ying Chen, Hu Da-liang. Power distribution system and its automation technology[M]. China Electric Power Press, (2009).

Google Scholar

[6] Jian Liu, Shu-ren Zhao, Xiao-qing Zhang. Development of distribution automation in China and some suggestions[J]. Automation of Electric Power Systems, 2012, 36(19): 6-10, 21.

Google Scholar