[1]
LONG Zhiyang, The present situation and research on template trolley, Water conservancy and hydropower construction, 4 (2002) 71-74.
Google Scholar
[2]
HAN Yinhong, Analysis of the structure of formwork trolley, SouthWest JiaoTong University, (2003).
Google Scholar
[3]
WANG Xin, ZHANG Baoyuan, WANG Bo, Simplified steel mould jumbo adopted for tunnel lining casting, Modern tunneling technology, 5 (2010) 103-107.
Google Scholar
[4]
JIANG Yuejin, LI Guoliang, Design and application of Magang tunnel steel mould trolley, West-china exploration engineering, S1(2005) 189-191.
Google Scholar
[5]
MA Qinfang, Analysis on force simulation of trolley based on Midas/civil, Road machinery& construction mechanization, 3 (2013) 73-75.
Google Scholar
[6]
XU Aiying, NIU Xu, ZHAO Zhengyao, Trolley tunnel lining structure of the finite element simulation and optimal, Journal of Tarim university, 4 (2009) 26-29.
Google Scholar
[7]
WANG Chunmei, XU Tao, ZHOU Shiqiang, Design of hydraulic trolley for a certain tunnel, Machine tool &hydraulics, 2(2011) 90-93+112.
Google Scholar
[8]
YUE Keqin, Secondary lining of tunnel template checking calculation, Technology and economy market, 5 (2007) 52-53.
Google Scholar
[9]
CAO Xiaolin, Loading analysis of lining jumbo during construction of concrete tunnel lining, Journal of railway engineering society, 3 (2002) 51-53.
Google Scholar
[10]
ZHAO Fu'an, HE Zhentong, The finite element structural analysis of tunnel lining trolley, Shanxi architecture, 11 (2008) 344-345.
Google Scholar