Preliminary Qualitative Findings: Challenges in Large Infrastructure Projects towards Development of Innovative Performance Measurement

Article Preview

Abstract:

Performance measurement system to assess development of large infrastructure project has developed due to the unachieved of high design and technical requirements, excessive cost investments and lack of competent human resources and managerial capabilities. Growing numbers of discrepant of interest among key participants has also led to conflicts, blame cultures, and mismatches of objectives that have been found to be contributory factors to poor project performance. Although, several approaches have been determined, the challenges in terms of time, cost, and quality (objective measures) are still arguable. Further exploration requires the inclusion of additional challenges in delivering large infrastructure projects, particularly in relation to subjective measures, such as safety, relationship, satisfaction, social and environmental aspects. Owing to this limitation, preliminary findings of identification challenges in large infrastructure projects are vital to fulfill the current needs in the development of innovative performance measurement. The research adheres to by reviewing relevant literature and evaluating expert insights on the research topic. The results of the research would provide qualitative evidence in support of the notion that appropriate and comprehensive performance measurement to improve project outcome. This study may also encourage key stakeholders mainly involved in infrastructure projects to increase their attention on possible challenges to achieve project objectives and requirements in the development of a large project, and helps to the achievement of government transformation programme (GTP).

You have full access to the following eBook

Info:

* - Corresponding Author

[1] N. ZainulAbidin, Environmental Concerns in Malaysia Construction Industry, first ed., The UniversitiSains Malaysia Co-operative Bookshop Ltd., Malaysia, (2010).

Google Scholar

[2] The Economic Unit Planning Unit, Tenth Malaysia Plan 2011-2015, Prime Minister's Department, Putrajaya Malaysia, (2010).

Google Scholar

[3] A. P. C. Chan, Framework for Measuring Success of Construction Projects Report 2001-003-C-01, Quensland University of Technology, Australia, (2001).

Google Scholar

[4] A. A. E. Othman, Challenges of Mega Construction Projects in Developing Countries, Orgaization, Technology and Management in Construction Journal, DOI 10. 5592/otmcj. 2013. 1. 10, (2013).

DOI: 10.5592/otmcj.2013.1.10

Google Scholar

[5] C. C. Cantarelli, Cost Overruns in Dutch Transportation Infrastructure Pojects, Bijdrage aan bet Colloqium Vervoersplanologisch Speurwek (Contribution to the Transport Planning Research Colloqium). http: /www. cvs-congres. nl/cvspdfdocs/cvs09_156. pdf.

Google Scholar

[6] B. Flyvbjerg, N. Bruzelius and W. Rothengatter, Megaprojects and Risk; An Anatomy of Ambition, Cambridge, Cambridge University Press, (2003).

DOI: 10.1017/cbo9781107050891

Google Scholar

[7] K. T. Frick, The Cost of The Technological Sublime daring Ingenuity and The New Sand Fracisco-Oakland Bay Bridge, Cheltenham Edward Elgar Publishing Limited, 239-262, (2006).

DOI: 10.4337/9781848440173.00020

Google Scholar

[8] S. Sturup, Megaprojects and Governability, World Academy of Science, Engineering and Technology, 54, (2009).

Google Scholar

[9] Memon A. H., Rahman I. A., Zainun N. Y., and Karim A. T. A. (2011) Web-based Risk Assesment Technique for Time and Cost Overrun (WRATTCO)- A Framewrok. . Universiti Tun Hussein Onn Malaysia. Procedia Social and Behavioral Science 00(2013).

DOI: 10.1016/j.sbspro.2014.03.664

Google Scholar

[10] Kamar K. A.M., Hamid Z. A., and Alshawi M. The zcritical Success Factors (CSFs) to The Implementation on Industrialised Building Systems (IBS) in Malaysia. Proceedings in CIB World Congress 2010, Salford, 10-13th May, (2010).

Google Scholar

[11] Proverbs D. G., Holt G. D., and Cheok H. Y. (2000).

Google Scholar

[12] J. W. Creswell, Research Design: Qualitative, Quantitative, and Mixed Methods Approaches, 4rd Edition. California, USA. Sage Publications, (2013).

Google Scholar

[13] R. Fellows and A. Liu, Research Methods for Construction, 3rd Edition. Blackwell Science Ltd, August (2008).

Google Scholar

[14] P. Dalsgaard, Challenges of Participation in Large-Scale Public Projects. Department of Information and Media Studies &Center for Digital Urban Living, Aarhus university, PDC 2010, November 29, (2010).

Google Scholar

[15] Z. Habib, The Critical Success Factors in implementation of Software Process Improvement Efforts: CSFs, Motivators & Obstacles, Department of Applied Information Technology, Gothenburg, Sweden, University of Gothenburg, (2009).

Google Scholar